7.0 7. First Power-On Checklist
- verify all wiring before powering
- verify common ground continuity on the DC side
- verify regulator or buck output voltage
- confirm the ESP32 is not connected directly to 12V
- confirm flyback diode orientation
- power the low-voltage system first
- test sensor reading and valve switching before enabling AC
- test relay logic before connecting the pump if possible
- only enable mains after the low-voltage side behaves correctly