Air Mattress Controller V1
Open-Source Adjustable Firmness System

7.0 7. First Power-On Checklist

  • verify all wiring before powering
  • verify common ground continuity on the DC side
  • verify regulator or buck output voltage
  • confirm the ESP32 is not connected directly to 12V
  • confirm flyback diode orientation
  • power the low-voltage system first
  • test sensor reading and valve switching before enabling AC
  • test relay logic before connecting the pump if possible
  • only enable mains after the low-voltage side behaves correctly
DIY Air Mattress Controller V1 • Open Source Project